Jul 24, 2021 – Brent Richter/North Shore News
Last summer, the Ministry of Transportation and Infrastructure completed about 1,000 square metres of resurfacing for the 3,000-square meter bridge.
“Since we’ve done some of the work, we have seen some improvement,” said Bowinn Ma, North Vancouver-Lonsdale NDP MLA. “We’re going to go back and do the rest of the work.”
“Drivers will remember the surface along that bridge was pretty terrible,” she said. “Anecdotally, we are seeing reduced crashes in the areas where resurfacing has already happened.”
Read the full article at nsnews.com.